Apex for manufacturing

Quotes for products that are built to order.

A manufacturer's quote is a configuration, a bill of materials, a lead time and often a surcharge tied to the price of steel or copper. Apex prices all of it from the items, routings and price lists already in your ERP, and a signed quote becomes a sales order your plant can schedule.

Configure · Model HX-40Plate heat exchangerValid
Plates316 stainless
FrameCarbon steel, painted
GasketsEPDM
ConnectionsANSI 150 flanged
GasketsViton (needs 316 plates)
Bill of materials and cost, from the ERP
PL-316-40Plate pack, 40$7,840
FR-CS-40Frame$3,120
GK-EP-40Gasket kit$612
CN-A150Flange set$948
Price $19,860Lead time 5 weeksplates on order

What applies

The Apex functions manufacturers start with.

01

Product configurator

Options, dependencies and exclusions, so a rep cannot quote a 40 kW motor on a frame rated for 30.

02

Index-linked pricing

Material surcharges tied to a published index, with a cap, a floor and the dates the price resets.

03

RFQ response

A buyer's line list imported from Excel, each line priced from the book, with versions kept as the buyer revises.

04

Price agreements

Customer-specific price lists and blanket orders that draw down as releases ship.

Price and lead time

Price, margin and lead time on the same screen.

Each configured option pulls its cost and lead time from the ERP. The quote shows margin per line and the longest lead time in the build before the rep sends it.

Cost from the ERP
Standard or current cost, whichever your controller uses for quoting.
Lead time from the routing
The slowest component sets the ship date the quote promises.
Configure · Model HX-40Plate heat exchangerValid
Plates316 stainless
FrameCarbon steel, painted
GasketsEPDM
ConnectionsANSI 150 flanged
GasketsViton (needs 316 plates)
Bill of materials and cost, from the ERP
PL-316-40Plate pack, 40$7,840
FR-CS-40Frame$3,120
GK-EP-40Gasket kit$612
CN-A150Flange set$948
Price $19,860Lead time 5 weeksplates on order

Quote to plant

From a configured quote to a schedulable order.

  1. 01

    Configure

    The rep picks options; rules keep the configuration valid and the bill of materials complete.

  2. 02

    Approve

    A quote under your margin floor or past standard lead time goes to the approver your rules name.

  3. 03

    Sign

    The customer signs, often against their own PO number, which Apex records on the order.

  4. 04

    Order

    A sales order is written to the ERP with the configured lines, ready for planning.

Yours

Your pricing logic stays yours.

How you price a configuration, which surcharges you pass through and which customers get which discount are your advantage. Apex is set up to your rules; you are not fitted into a template, and no one else's pricing is in it.

01

Your rules

Configuration and pricing rules are written for your catalog, not imported from a library.

02

Your data

Kept in your own tenant, with models running inside your environment.

03

Your record

The ERP stays the system of record for every order and invoice.

Agents propose, people approve

The agent drafts. A person decides.

A quoting agent reads an inbound RFQ or inquiry, maps the customer's part descriptions to your items, and drafts the configured quote for a rep to check.

Every agent stops at an approval gate until it has earned its way out of one. Nothing releases cash, commits spend or touches a customer without a person saying so.

Your dataModels that read your data run inside your environment, behind your firewall. No client data reaches a frontier lab.

Start here, keep the foundation

Start with one function. Add the rest without starting over.

A good first function for a manufacturer is the configurator or RFQ response, because that is where quotes stall. The customers, items and price lists Apex brings down from the ERP are then ready for billing, rebates or revenue recognition whenever you add them.

FAQ

Questions, answered plainly.

What is CPQ for manufacturing?

CPQ for manufacturing is quoting software that understands configured products: options, dependencies, bills of materials, cost and lead time. It lets a sales team quote a valid build at the right margin without asking engineering for every quote.

Does Apex need its own bill of materials?

No. Apex reads items and bills of materials from your ERP. Configuration rules sit in Apex on top of them, and the order it writes back uses your item numbers.

Can surcharges follow the price of steel or copper?

Yes. A price can be tied to an index you choose, with a base value, a cap, a floor and reset dates. Apex reprices on those dates and shows the customer how the change was calculated.

How do we handle a buyer's RFQ spreadsheet?

Import it. Apex matches each line to your items, prices it from the book or the customer's agreement, and flags lines it could not match for a person. Every revision the buyer sends is kept as a version.

Which ERPs do manufacturers use Apex with?

SAP Business One, SAP S/4HANA, Oracle NetSuite and Microsoft Dynamics 365, configured to your own company codes, plants and item masters.

Will the configurator know our engineering constraints?

It knows the ones you give it. Ferrata's engineers write the rules with your product and engineering teams, so the constraints are yours rather than a generic set.

Start with Apex, or talk it through first.

Thirty minutes with Ferrata Labs on one workflow. You leave with a view of where Apex fits, and an honest answer if the sequencing is wrong and you should fix something else first.

Your pricing, approval and billing rules are your advantage, and they stay yours. Apex is configured to the way you sell and bill. You are not handing over a playbook or fitting into a template.